NCR,Chennai

Overview

NCR Corporation is a manufacturer of ATM machines. Their new facility at the Mahindra World City needed to be tested/certified for 1-hour fire resistant with a height of 7meters.

Project Highlights

All Gyproc fire rated systems are tested and certified. 7 meter wall height was constructed using 208mm systems consisting of 148mm stud with double layer of 15mm Gyproc® Fireline Board. The drywall system provided a fire protection of 1 hour as per the requirement of the project. 

Architect: P.T K Architect
Contractor: Kaveri Buildtech Pvt Ltd.

Similar Projects

Greaves Cotton

Greaves cotton is a manufacturer and supplier of agricultural and industrial equipments and machines. A typical manufacturing setup like Greaves Cotton Ltd. required a robust interior construction technology that could guard against heavy movement of material in and around shop floor, wear and tear caused by forklifts and large soft body impact (human movement).

View Project

Bosch

Bosch, a leading supplier of technology and services, was setting up its 5th manufacturing facility in Bidadi. The project required construction of partitions over height of 6 meter, while maintaining thickness of 150mm. The plan for the shopfloor required performance solutions for moisture resistance. Specific areas also required high material movement hence, performance solutions for impact resistance were important.

View Project

Our Solutions

Gypsum Plastering

Gypsum plastering is a modern day solution to time consuming and ecologically straining process of Sand Cement plaster. 

Know More

Ceilings

Ceilings are one of the important elements of an interior space as they offer the maximum unobstructed view of working spaces.

Know More

Drywalls

A drywall is a high performance lightweight interior wall system consisting of a GI steel frame...

Know More